Skip to product information
1 of 2

Fair Book Deals

International Building Code 2021 and International Residential Code 2021 IBC 2021, IRC 2021 International Code Council

International Building Code 2021 and International Residential Code 2021 IBC 2021, IRC 2021 International Code Council

SKU:

Regular price $124.98
Regular price Sale price $124.98
Sale Sold out
Shipping calculated at checkout.

  • Free & Fast Shipping
  • Easy Return
  • Secure Payment

Exclusive Offers Just for You!

Save 15% on orders of $399+

Use Code: DEAL15 📋

Save 20% on orders of $799+

Use Code: DEAL20 📋

✈️ Enjoy Free Shipping on all orders!

Product Details

  • Condition: New
  • Publisher: ICC
  • Language: English
  • Paperback:
  • ISBN: 9781609839574
  • Item Weight:
  • Dimensions:

Description

IBC 2021 9781609839550

This code applies to all buildings except detached one- and two-family dwellings and townhouses up to three stories. The 2021 IBC contains many important changes such as: Puzzle rooms (escape rooms) are now defined and regulated as special amusement areas, requiring compliance with Section 411 and special means of egress requirements. For the purposes of determining the allowable number of control areas in a building, each portion separated by one or more fire walls is now considered as a separate building. In Group E occupancies, enhanced classroom acoustics in compliance with ICC A117.1 are to be provided in all classrooms having of volume of 20,000 cubic feet or less. The requirements for metal composite materials and systems (MCM) installed on the exterior walls of Types I, II, III and IV construction were simplified and sprinkler allowances were deleted. The use of intermodal shipping containers as buildings is now specifically addressed through provisions intended to supplement existing applicable IBC requirements. Automatic sprinkler protection is now required in Group S-2 open parking garages where any fire area exceeds 48,000 square feet. The 2017 edition of ICC A117.1 was adopted. Parapets of a minimum height are now required for aggregate-surfaced roofs to prevent blow-off. Mixed occupancy buildings with assembly spaces are placed in Risk Category III when the total public assembly occupant load is greater than 2500 people. The 2021 IBC snow map is updated to match ASCE 7-16 snow maps by adding a reference to ASCE 7 snow tables in states with large case study areas. Secondary rain loads are updated to be consistent with ASCE 7.

IRC 2021 9781609839574

This comprehensive code comprises all building, plumbing, mechanical, fuel gas and electrical requirements for one- and two-family dwellings and townhouses up to three stories. The 2021 IRC contains many important changes such as: Braced wall lines must be placed on a physical wall or placed between multiple walls. The rated separation for two-family dwellings is 1 hour whether or not a lot line exists between units. Emergency escape and rescue openings require a clear 36-inch-wide path to a public way. An engineered design is required for storm shelters. A habitable attic is limited to one-half the area of the story below and the dwelling requires sprinklers. Updated Wind Speed maps match IBC and ASCE 7 maps. Deck design now considers snow load, tributary area for footing and post height, and guard details. Specific requirements for deck guardrails were added. Component and cladding wind pressures in Table R301.2(2) are updated for new design wind speeds and hip or gable roof profiles. Minimum footing size tables are revised to more accurately reflect current practice. Cripple wall requirements apply only to exterior cripple walls. New appendices for cob construction and 3D printed construction are added. A 30 percent reduction of airflow is permitted for balanced ventilation systems. Commercial gas cooking appliances are prohibited. The head pressure for a water test of DWV systems increased to 10 feet. Air vacuum testing is now permitted for plastic piping DWV systems. Section P2904 for dwelling sprinklers is expanded to more closely align with NFPA 13D. An emergency service disconnect is required in a readily accessible outdoor location. A surge-protective device (SPD) is now required at the service panel. The number of receptacle outlets required for peninsular and island countertops in kitchens is determined by the area of the countertop surface.

Shipping, Return & Exchange

Shipping & Delivery:
- Normal Delivery: Estimated delivery time is 5 to 7 business days from the date of shipment.
- Express Delivery: Estimated delivery time is 3 to 5 business days from the date of shipment.

Returns & Exchange:
- We accept returns within 30 days after delivery. Please read our refer to our Return and Exchange Policy for more detail.

View full details

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)